How Ultra-In Solved the Toughest Challenges
Value | Durability | Sustainability
Premium Spaces
Humble House Taipei
- Locations:
- Outdoor Swimming Pool
- Pain Point:
- Conventional WPC decking warped and deformed under prolonged sun and water exposure, affecting appearance.
- Client required a lower-carbon recycled material to meet the “Diamond Green Building” certification standard.
- Solution:
- Replaced existing WPC panels with Ultra-In low-carbon circular polymer lumber decking.
- Installation Area
- 202 m2
- Completion
- Dec, 2025
- Sustainability Benefits:
- Embodied carbon reduction vs conventional WPC: ~ 3.5t CO2e/t
- Plastic waste diverted from landfill: ~ 3.2t

General Outdoor Spaces
Facade Grid & Fence in Luodong, Yilan County
- Locations:
- Facade Grid & Fence
- Scope of Work
- Ultra-In low-carbon circular polymer lumber profiles replaced aluminum extrusion grilles and fence strips throughout the facade. Metal was retained for structural framing and horizontal supports only.
- Installation Area
- 2150 m2
- Completion
- Dec, 2025
- Sustainability Benefits:
- Embodied carbon reduction vs conventional WPC: ~ 44.3t CO2e/t
- Plastic waste diverted from landfill: ~ 17.3t



Fences at Solar Power Stations
Solar Power Stations in the Fishery Port in Budai, Chiayi County
- Locations
- Site of the phase I project at the Tourist Center
- The 3rd parking lot
- Pain Point
- Facing relentless rust in CX’s harsh coastal environment, the galvanized steel fences quickly deteriorated—becoming a major eyesore and a serious safety hazard.
- Solution
- Upgrading from Galvanized Steel to Ultra-In low carbon circular polymer lumber for severe outdoor conditions
- Completion
- The phase 1 project at the Tourist Center: Jan., 2024
- The 3rd parking lot: May, 2024
- Structural Calculation
- Design wind speed: 42.5 m/s (10-min average wind speed)

The old fence: patches of rust appeared all over the galvanized steel
Ultra-In fence has solved the problem of rust

Maintenance Trail at Solar Power Stations
Solar Energy in Aquaculture in Budai, Chiayi
- Length:
- About 1 kilometer
- Pain Point:
- Maintenance and repair workers operating at height can see the original mesh expanded metal sheets through that was believed to be an safety issue
- Specifications:
- Panels of Ultra-In for severe outdoor conditions CW-PC06025100/CW-PC06030150
- Time of Delivery:
- Feb., 2024

Green Pallets, Transportation
Evergreen Logistics: Winner of ESG Logistics Sustainability Award – Gold Award of 2024
- Location:
- A warehouse in Nankan, Taoyuan
- Requirements:
- Upgrading services for their customers in terms of sustainability
- Introducing 3Rs to establish circular economy
- Specifications:
- Planks of Ultra-In Metal-like: CW-PC06025100/CW-PC06030100
- Type: one way
- Length:120cm
- Width: 100cm
- Height: 12.5cm
- Weight: 20kg
- Time of Delivery
- Dec. 2023

Outdoor Decking, Construction Materials
- Location:
- A private villa in E-mei Township, Hsinchu
- Deck Size:
- About 100 m2
- Pain Point:
- Unsolvable wood weathering
- Specifications:
- Planks of Ultra-In Metal-like: CW-PC06030150
- Completion Time
- Jul. 2023


Rotten Pinewood
Demolition in Process


Same as Woodwork